Guide: What to Expect During the Design Build Process

When working with a design-build company, the traditional stages of architectural design and construction are streamlined and integrated, as both design and construction responsibilities are handled by a single entity. This approach often leads to improved communication, faster project timelines, and potential cost savings. Here’s how the stages look with a design-build company:





1. Project Initiation

  • Client Consultation: Understanding the client's needs, goals, budget, and expectations. This phase is similar to the traditional pre-design phase but involves direct engagement with the design-build team.

  • Team Formation: Assembling an integrated team that includes architects, engineers, and construction professionals from the outset.


2. Conceptual Design and Feasibility

  • Integrated Design: The design-build team collaboratively develops initial design concepts considering both design aesthetics and construction methods.

  • Feasibility Studies: Conducting financial, technical, and site feasibility studies with direct input from construction experts to ensure practicality and cost-effectiveness.

  • Client Approval: Presenting and refining concepts with the client until a preferred option is selected.


3. Design Development (DD)

  • Detailed Design: Further developing the selected concept into more detailed plans with simultaneous input from construction professionals to ensure buildability and budget alignment.

  • Early Contractor Involvement: Construction teams provide input on materials, methods, and potential cost-saving measures during the design phase.

  • Client Review: Ongoing client engagement and feedback integration to ensure the design meets all requirements.


4. Construction Documents (CD)

  • Comprehensive Drawings and Specifications: Producing detailed construction documents with close coordination between designers and builders to avoid discrepancies and ensure all details are constructible.

  • Permitting: Handling the submission of documents to local authorities for building permits, often streamlined by the design-build team’s familiarity with the process.


5. Pre-Construction Planning

  • Finalizing Budget and Schedule: Developing a detailed construction budget and schedule with input from both design and construction teams.

  • Procurement Planning: Planning for procurement of materials and subcontractors with early involvement to ensure timely delivery and quality control.


6. Construction

  • Integrated Project Management: Managing the construction process with continuous communication between design and construction teams to address any issues quickly and efficiently.

  • Site Supervision: Regular site visits and supervision by the design-build team to ensure the project adheres to the design intent and quality standards.

  • Change Management: Handling any design changes or unforeseen issues on the fly with seamless coordination between all parties involved.


7. Project Closeout

  • Final Inspections and Punch List: Conducting final inspections and developing a punch list of items to be completed or corrected, with immediate attention from the integrated team.

  • Client Handover: Ensuring all documentation, warranties, and manuals are provided to the client. This stage is often smoother due to the continuous involvement of the design-build team throughout the project.


8. Post-Construction

  • Post-Occupancy Evaluation: The design-build team may conduct a post-occupancy evaluation to ensure the building performs as intended and address any remaining issues.

  • Maintenance and Support: Offering maintenance support and guidance, leveraging their deep understanding of the project from inception to completion.


Key Differences with Design-Build:

  • Single Point of Responsibility: The design-build company is responsible for both design and construction, reducing the risk of miscommunication and conflict between separate entities.

  • Streamlined Communication: Direct communication channels between designers and builders facilitate quicker decision-making and problem-solving.

  • Faster Project Timelines: Overlapping the design and construction phases can lead to faster project completion.

  • Cost Efficiency: Early and continuous cost estimation and value engineering help keep the project within budget.

  • Collaborative Approach: A cohesive team works together from start to finish, ensuring that design and construction are fully integrated.


Overall, the design-build process offers a more collaborative, efficient, and client-centered approach compared to the traditional design-bid-build method.